Install Responsibilities
This page outlines the primary responsibility clients and SyncTimes have for typical installs.
Last updated
This page outlines the primary responsibility clients and SyncTimes have for typical installs.
Last updated
SyncTimes will Provide
Client Responsible to Provide (Typically through subcontractors)
Firewall (Meraki) - 1U per site
Network connectivity (additional details here)
Switching Equipment (Cisco SMB) - 1U per 20 rooms
UPS (switches require approx. 400W per 20 rooms)
Exam room tablets
Low-voltage (CAT5e or better) cabling from clinical areas to wiring closet, punched down into patch panel at closet & RJ45 at rooms
Ceiling nodes
All patch cables
120V wiring & outlets (350W per television display)
PoE Flowstation control module
19" rack space for SyncTimes network equipment and patch panels (typically 2U per 10 rooms)
All mounting hardware for tablets
Procurement, install and mounting of Flowstation displays
Patch panels and rack space for SyncTimes drops